Timeline
- Bay roof insulation (2008)
- Woodburner (2008)
- Solar thermal (2008)
- Loft insulation (2008)
- New door (2009)
- IWI (100mm PUR) (South side) (2009/10)
- Airtightness
- Solar PV (2010)
Retrofit interrupted by:
- Extension (2011-2014)
(200mm cavities, 3G, 270mm PUR roof, 200mm XPS floor, plus extra thermnal mass, thermal breaks added where walls are joined, UFH
- Garage->Workshop: (2015/16) 50mm floor XPS, 100mm wall PUR, Roof 200mm PUR as park of extension works, UFH.
- More airtightness and MVHR (2017/18)
- Perimeter insulation (2019/2021)
- 3G windows all round (2020)
- EWI 160-200mm woodfibre (North Side) (2020)
- Eaves (N side) (2020)
- Skeilings (2021)