The one on the left are completed apart from the mounting holes. M3 threaded holes to hole the star down. M3 clearance for the standoff posts. The RH plates have the wire passthorugh holes missing. 8 holes per completed plate in total.
30/10/09 12:05:21
800 × 600
111.1 kB
The full set of pannelage. Some shading on left from large cherry tree, even after it was severely cut back.
05/05/08 20:21:25
800 × 600
139.1 kB
The return (cool water back to panel), with a couple of nogginson the purlin to hold it up. The panel-holding noggins and straps are also visible.
14/05/08 12:01:33
600 × 800
185.2 kB
This is the business part of the plumbing. From bottom right (which comes out of the PHE), we have drain cock, pump, flowmeter, filling point, check valve with bypass, then T off to pressure guage and EV. Solar return is out the top. The pump is the Davies-craig 'EBP' which provides flow rates from 2-24l/m (2-24W), so should be lower consumption than a conventional CH pump.
11/05/08 21:46:57
600 × 800
121.1 kB
This shows the PHE fitted in relation to the hot water tank. It is attached at the coldfeed pipe and the vent pipe. This is supposed to thermosiphon sufficiently to move heatinto the tank. This arrangement is something of an experiment to see how well it works with an existing tank.